New Construction Landscaping in Paso Robles

A new home in Paso Robles is not finished until its landscape is. Inside city limits, the landscape plan goes in with the building plans, and the City signs off on the installed yard before it issues the Certificate of Occupancy. That puts the front yard, the irrigation and the planting on the same schedule as the house. Paso Robles Landscaping designs and installs new construction landscapes for homeowners and builders in Paso Robles and across San Luis Obispo County: grading touch up, drainage, irrigation, hardscape and planting, built to the water budget the City approves. Call 805-712-4440 or discuss your project.

Covered patio with stone veneer columns, a paver walkway and a young lawn
A finished install by our crew in Atascadero: paver walk, covered patio and a young lawn. Shown for the type of work; it is not a Paso Robles new construction project.

Short Answer

If your new house in the City of Paso Robles will have 500 square feet or more of landscape, the City’s Zoning Code (Chapter 21.22B) requires a Landscape Documentation Package with, or before, the construction drawings for building plan check, and the City must issue a Certificate of Completion for the landscape before it issues the Certificate of Occupancy for the house. The package proves the yard will stay inside a water budget, and the certificate proves it was built that way. Oak trees on the lot add their own permits.

The Four Steps, at a Glance

From the City’s Landscape and Irrigation Design Guide (2015 edition) and its Oak Tree Preservation rules, read November 20, 2026.

StepWhenWhat the City asks for
Landscape Documentation PackageWith or before the building plan check submittalApplication form, Water Efficient Landscape Worksheet, landscape design plan, irrigation design plan
Soil management report and grading design planSame package, when requiredLandscape area of half an acre or more, or turf proposed in a front or street side yard
Oak tree permitsBefore grading or trimmingRemoval of an oak 6 inches or more in diameter needs a Removal Permit, approved arborist report and City Council approval
Certificate of CompletionAfter install, before the Certificate of OccupancySigned installation certification, record drawings for field changes

What Goes in the Landscape Documentation Package

The City’s guide lists four required parts, plus two more for bigger yards or front yard turf:

  • Application form. The City’s Standard Development Application from the Community Development Department.
  • Water Efficient Landscape Worksheet. Each hydrozone is listed with its plant water use, and the estimated total water use has to come in under the maximum applied water allowance. For homes, the guide sets the evapotranspiration adjustment factor at 0.55 or below, and plant factors come from the WUCOLS list.
  • Landscape design plan. Hydrozones labeled low, moderate, high or mixed water use, recreation areas, edible gardens, mulch type and depth, soil amendments, water features, pervious and non pervious hardscape and any stormwater features.
  • Irrigation design plan. Meter and point of connection, controllers, valves, heads, sensors, pressure regulators and backflow device, with the static pressure and each station’s flow, application rate and operating pressure.
  • Soil management report (when required). A lab analysis of texture, infiltration rate, pH, salts, sodium and organic matter, with amendment recommendations.
  • Grading design plan (when required). Slope heights, drainage patterns, pad elevations and finish grade. A civil engineer’s grading plan for the house can satisfy this part.

The last two are required when the landscape area is half an acre or more, or when turf is proposed in a residential front or street side yard. The plans carry signed statements that they comply with the ordinance, signed by a licensed landscape architect, licensed landscape contractor or another person the state authorizes to design a landscape.

Design Rules That Shape a New Paso Robles Yard

The water budget leaves room for almost any plant, but the guide sets firm rules that change how a new yard is laid out:

  • Turf placement. No turf on slopes over 20 percent where the bottom of the slope meets paving, and no turf or high water use plants in parkways or street medians.
  • Narrow strips. Planting areas under 10 feet wide in any direction need subsurface irrigation or another method with no runoff or overspray, and overhead spray is not allowed within 24 inches of non permeable paving unless the design shows it will not run off.
  • Valves by water use. Each valve serves plants with similar water needs. High and low water use plants cannot share a valve, and trees go on their own valves where feasible.
  • Slopes. On slopes over 25 percent, spray cannot apply more than 0.75 inches of water per hour unless the designer shows no runoff or erosion.
  • Soil and mulch. Compacted soil is loosened before planting, compost goes in at a minimum of four cubic yards per 1,000 square feet of permeable area, tilled six inches deep (unless the soil already has more than 6 percent organic matter), and exposed soil in planting beds gets mulch.
  • Water features. Fountains must recirculate, and their surface area counts in the high water use hydrozone.
  • Equipment. Weather or rain sensors, a manual shut off valve near the point of connection, backflow prevention, pressure regulation when needed and a master shut off valve.
  • Fire safety. In fire prone areas the plan addresses defensible space under Public Resources Code 4291 and avoids flammable plants and mulches.

New tract homes on clay soils feel these rules first: compacted pads, narrow side yards and parkway strips are exactly where spray heads and lawn are most restricted. We plan those areas as drip, low water planting or hardscape from the start.

The Certificate of Completion

After the install, the City reviews a signed Certificate of Completion. Per the City’s guide, it includes the project information and a certification from the signer of the landscape or irrigation plan, or the licensed landscape contractor, that the landscape was installed per the approved package, with record drawings for any changes made in the field. The state’s MWELO applicant brochure adds an irrigation schedule, a landscape and irrigation maintenance schedule, an irrigation audit report and, where it applies, proof that the soil report recommendations were followed. Because the City issues this certificate before the Certificate of Occupancy, we schedule the landscape install with the builder’s final, not after move in.

Oak Trees on a New Construction Lot

Paso Robles protects its oaks. The City’s Oak Tree Preservation rules protect a Critical Root Zone that is generally larger than the drip line and cannot be shrunk by trimming the canopy, and they add protection for oaks on sites being graded and developed. Removing an oak with a trunk diameter of 6 inches or more at 4.5 feet above the ground requires a Removal Permit, an arborist report from a City Council approved arborist and City Council approval, and the replacement tree must be the same species and in proportion to the tree removed. Trimming oak branches 6 inches or more in diameter on a vacant, undeveloped site in conjunction with a building permit also takes a permit. For removal questions the City lists the Planning Division at 805-237-3970.

For the landscape, that means trenching for irrigation and lighting, grade changes and new planting all have to respect the root zone. We route mainlines and drip around protected oaks and keep lawn and frequent water away from their trunks.

After You Move In: Watering Rules

New plantings need regular water while they establish, and Paso Robles has standing rules for City water customers: no runoff, no watering during or within 48 hours after measurable rain, and fountains must recirculate. Under the current Level 1 Voluntary condition the City asks customers to water before 9 a.m. or after 7 p.m. Our watering rules by town page compares Paso Robles with Templeton, Atascadero and the rest of the county, and our irrigation page for Paso Robles covers controllers and drip conversions.

Outside City Limits

Many new homes around Paso Robles are on county land, in Templeton or on rural parcels in the hills. There, San Luis Obispo County or the local community services district handles review instead of the City. The state’s Model Water Efficient Landscape Ordinance still applies to new construction projects with 500 square feet or more of landscape that need a building or landscape permit, plan check or design review, so the same kind of water budget and plan set usually comes up. We confirm the agency and its submittal list at the first visit.

How We Build a New Construction Landscape

  1. Site walk and builder plans. We review the site, grading and utility plans with you or your builder and note oaks, slopes and drainage paths.
  2. Design to the water budget. Planting, hardscape and irrigation laid out by hydrozone so the worksheet works on the first try.
  3. Package for plan check. Landscape and irrigation plans and the worksheet, ready to submit with the building plans.
  4. Sleeves before concrete. Irrigation and lighting sleeves set under walks and driveways before the flatwork is poured.
  5. Install. Fine grading, drainage, hardscape, irrigation, planting and mulch. Pools and spas go in with our pool partner.
  6. Close out. Controller programming, record drawings and the paperwork the Certificate of Completion needs.

Building with Harrod Built? Our sister company builds custom homes in Paso Robles, and Harrod Drafting & Design draws new home plans, so the landscape can be planned with the house. For other projects in town, see landscape design in Paso Robles, backyard remodels, fire safe landscaping, commercial landscaping and our backyard landscaping cost guide.

Frequently Asked Questions

Do I need a landscape plan for a new home in Paso Robles?

Yes, if the new home has 500 square feet or more of landscape area. The City’s Zoning Code Chapter 21.22B requires a Landscape Documentation Package to be submitted with, or before, the construction drawings for building plan check.

Can I move into my new house before the landscaping is done?

Plan on finishing it first. The City has to issue a Certificate of Completion for the landscape before it issues the Certificate of Occupancy for the house, so the landscape is part of the path to final.

Can I have a lawn in the front yard of a new Paso Robles home?

You can have some turf, as long as the yard stays inside its water budget. Turf is not allowed on slopes steeper than 20 percent where the bottom of the slope meets paving, turf and high water use plants are prohibited in parkways and medians, and proposing turf in a residential front or street side yard adds a soil management report and grading design plan to the package.

What does the Certificate of Completion include?

A signed certification from the person who signed the landscape or irrigation plan, or the licensed landscape contractor, that the landscape was installed per the approved package, plus record drawings for any changes made in the field. The state ordinance also lists an irrigation schedule, a maintenance schedule and an irrigation audit report.

Can I remove an oak tree to build?

Only with City approval. Removing an oak with a trunk 6 inches or more in diameter at 4.5 feet above the ground takes a Removal Permit, an arborist report from a City Council approved arborist and City Council approval, and replacement trees of the same species.

Do you work with my builder?

Yes. We work from the builder’s site and grading plans, coordinate irrigation sleeves before concrete goes in, and schedule the install so the landscape is ready for the City’s sign off. Pools go in with our pool partner.

Discuss Your Project for Your New Home’s Landscape

Send us the address and your site plan, or have your builder send the plans, and we will walk the lot and price the landscape, from the plan check package to the final walk through. We design and install across San Luis Obispo County and the Central Coast.

Call or text 805-712-4440  |  Discuss your project

Requirements on this page come from the City of Paso Robles and California Department of Water Resources documents linked above, read November 20, 2026. Rules change and every lot is different, so confirm with the City of Paso Robles Planning Division (805-237-3970) before relying on any single line.