Irrigation Systems in Morro Bay
On the streets of North Morro Bay, the Cloisters and the hillsides above Main Street, we design, put in and fix residential watering systems suited to a windy, foggy coastline: drip under mulch, a limited amount of low-angle spray, and controllers that respond to local conditions. Morro Bay’s city government sells the water and also writes the landscape standards in its Zoning Code, and right now it has the town under a water supply condition that keeps sprinklers off through the middle of the day. All of our pipe, valves and wiring stay on the client’s side of the property line.

This guide covers watering plants. Getting storm water away from the house is its own topic on Morro Bay yard drainage, terraced slopes are on retaining walls in Morro Bay, and new walks and slabs are on Morro Bay concrete flatwork. Our overall method is described under irrigation services. Coastal towns with other water suppliers have separate guides, including Pismo Beach irrigation and Nipomo irrigation.
Quick Reference: Morro Bay Watering Rules
Each line below traces to a City of Morro Bay page or document checked on Friday, October 30, 2026.
| Topic | What the City says | Where |
|---|---|---|
| Water supply condition today | Moderately Restricted, under Municipal Code 13.04.345(B) | Water Conservation page |
| Midday watering | Outdoor irrigation is not allowed from ten in the morning to four in the afternoon while that condition is in effect | Water Shortage Contingency Plan, Stage 2 |
| Runoff and hosing paving | Irrigation causing excessive gutter runoff is prohibited, and driveways, patios and sidewalks may not be washed down with water | Stages 1 and 2 |
| Projects covered by the landscape chapter | All new development, plus new or redone landscapes that include over 500 square feet of newly irrigated ground | Zoning Code 17.25.020 |
| Plant choices | Pick one of three paths: all low-water plants, mostly low-water plants (homes only), or a State water budget calculation | 17.25.050(A)(2) |
| Lawn limits | Grass capped at one fourth of the planted area, kept off ground sloping over 25 percent and out of any space narrower than 10 feet | 17.25.050(A)(4) |
| Steep slopes and narrow strips | Below-grade drip or another system that neither overshoots nor runs off | 17.25.060(A)(2) |
| Help paying for upgrades | Four rebates (lawn conversion, drip retrofit, rain barrels, smart controllers), each with separate terms | Water Conservation Rebate Program |
Common Morro Bay Irrigation Jobs
Most calls begin with a clock that waters at noon or a row of heads fogging the sidewalk. The jobs tend to sort into these categories:
- Inline drip and point-source emitters for foundation beds, hillside plantings, food boxes and new trees; a filter and regulator sit at each drip valve
- Matched-precipitation rotary nozzles kept for the few planted areas that truly need spray, set back from walks and drives so paving stays dry
- Controllers that change run times as the weather or the ground moisture shifts, paired with a rain cutoff and memory that survives a power outage
- Lawn-to-garden conversions: spray heads removed or capped, the lateral lines rerouted, and low-volume drip carried out to each new plant
- Finding the cause of a jump in the water bill and fixing it, from a stuck valve to a cracked lateral to a sunken head
- Seasonal checkups where we run the system zone by zone, clear clogged emitters, adjust arcs and reset the schedule
- A dedicated garden supply downstream of the City meter on private ground, with a shut-off valve near the tap and whatever backflow assembly that hookup calls for
When the City Landscape Chapter Applies
Morro Bay put its landscape standards in Chapter 17.25 of the Zoning Code, the version certified by the Coastal Commission in March 2024. Among its stated purposes are promoting efficient water use and carrying out the State’s Water Conservation in Landscaping Act. Statewide, the Department of Water Resources’ MWELO page says cities and counties have to adopt and enforce either the model water efficient landscape ordinance or their own version that does as well; DWR’s newest model amendments have applied from January 2, 2025 on.
Section 17.25.020 lists what the chapter reaches: all new development, certain multi-unit and non-residential additions, and every new or rehabilitated landscaping project with over 500 square feet of newly irrigated landscape. Farming and crop areas, including home vegetable plots, vineyards and small orchards, are exempted. Lots inside the Coastal Resource Protection overlay also answer to Chapter 17.14. Swapping a few valves or heads in an established yard does not obviously fit any of those triggers, but a sizable redo of the planting can, so before a larger project we ask the City which rules attach rather than assume.
When the chapter applies, the permit application carries a landscape plan. Section 17.25.040 asks it to show plant locations, species, sizes and WUCOLS plant factors with plants of similar water needs grouped together, trees to keep or remove, paths and seating areas, outdoor lighting, and the proposed method and location of irrigation. We draw the irrigation sheet so the hydrozones on it match the planting groups on the landscape sheet.

Plant Paths, Lawn Limits, Mulch and Compost
- Option A, all low-water plants. Apart from food gardens, every plant and tree is low or very low water use, for an average WUCOLS plant factor of 0.3. Any property may use it.
- Option B, mostly low-water plants. Residential only: at least 85 percent of the landscape area in low or very low water plants, with the same 0.3 average, which leaves a little room for thirstier favorites.
- Option C, water budget. Estimated total water use may not exceed the maximum applied water allowance figured under the State model ordinance, and choosing this path brings in all of that ordinance’s requirements.
The same section holds lawn to 25 percent or less of the landscaped area, keeps it off slopes above 25 percent and out of spots under 10 feet across, and prohibits plants that Cal-IPC lists as invasive. Exposed soil in planting areas gets at least three inches of mulch, compost is mixed in at a rate of at least four cubic yards for every 1,000 square feet, worked six inches down, unless a soil test shows it isn’t needed, and decorative water features must recirculate. Those soil and mulch steps are the cheapest water savings in a new garden, so we build them into every planting plan whether or not the chapter applies.
What Section 17.25.060 Asks of the Hardware
The City’s irrigation specifications read like a checklist for a sound residential system:
- Tested equipment. Every component has to satisfy the ANSI and ASABE/ICC 802-2014 landscape sprinkler and emitter standard, and installed heads need documented distribution uniformity (low quarter) of at least .65.
- No water on paving. Systems are designed for zero runoff onto paved surfaces, and spray heads sit at least two feet back from hard surfaces unless that surface drains into another planted area.
- Slopes and strips. Slopes above 25 percent and areas under 10 feet wide get subsurface irrigation or another no-runoff method; on those steep slopes the application rate may not exceed 0.75 inch per hour and check valves are used to stop low-head drainage.
- Cycle and soak. Equipment and schedules, repeat cycles included, are matched to how fast the soil can take water.
- Matched heads and steady pressure. Emission devices share precipitation rates, and regulating valves hold dynamic pressure where the manufacturer recommends.
- Controllers. Automatic, driven by ET readings, soil sensors or at least a rain shutoff device, and holding their program through a power interruption.
- Valves. Plants with different water needs go on separate valves, and valves are placed near the point where the system taps the supply so a break can be shut off quickly.
- Flow sensing. Residential projects of 5,000 square feet and up need flow sensors that catch the high flow from a broken pipe.
Signing Off the Finished Job
Under Section 17.25.070, once the planting and irrigation are in, the licensed project contractor does a field observation and submits a certificate of completion stating that plants went in as specified and the system was installed as designed, with any deficiencies listed. Projects that used Option C also file the State ordinance’s own certificate of completion. We leave the owner a zone map and the watering schedule along with that paperwork.

Watering Under the Current Supply Condition
Right now the City conservation page places Morro Bay in the Moderately Restricted condition of Municipal Code 13.04.345. The Water Shortage Contingency Plan lays out what that stage means outdoors: sprinklers and drip shut off from 10 a.m. until 4 p.m., customers directed to use no more water than it takes to maintain their landscaping, no hosing of driveways, patios or sidewalks except for health or safety, and no watering heavy enough to send a stream down the gutter. Newly planted landscaping put in before the restrictions took effect can get a temporary exemption from the gutter-runoff rule if the owner documents the planting date to the City’s satisfaction; it ends once the plants are established.
The same plan shows what tighter stages look like. Under Severely Restricted conditions, landscape watering would drop to two set days a week based on whether the address is even or odd, and a Critical stage narrows it further. So we set controllers to finish early in the morning, give each drip zone its own program, and show owners how to change watering days from the controller in a few minutes if the City Council changes the stage.
Backflow Protection and the Service Line
California’s State Water Resources Control Board sets cross-connection rules for public water systems through its Cross-Connection Control Policy Handbook, which took effect July 1, 2024 and was revised by the Board on April 21, 2026. An irrigation system connected to the drinking water supply needs protection against water flowing back into the City’s pipes, and the right assembly depends on the hazard. We confirm the required protection with the City’s Water Division before building a new tie-in, and place the assembly so the annual tester has clear access.
For new development and larger additions, Section 17.23.130 of the Zoning Code names backflow preventers and irrigation control valves among the equipment to be screened from public rights-of-way, so we plan a spot behind a low hedge or a small enclosure instead of the middle of the front lawn. The meter, the service line to it and everything in the street belong to the City.
Coastal Conditions and How We Design for Them
Morro Bay gardens deal with sandy soil near the water, heavier ground on the hills, salt air and steady afternoon wind. The City’s outdoor water tips and lawn care tips match the way we lay out systems here:
- Group plants by thirst. The City suggests grouping plants with similar water needs; we give each group its own valve so the natives aren’t watered like the citrus.
- Use the efficient device for each spot. Micro and drip irrigation and soaker hoses are the City’s examples; buried drip lines beneath bark keep salty overspray off foliage, too.
- Several short runs. The lawn tips recommend shorter sessions so water soaks in, which is also how we program clay slopes.
- Keep spray on the plants. Heads are aimed away from paving, and fine-mist nozzles that drift in the wind are replaced.
- Check the timer. The City advises checking systems and timing devices regularly; our tune-ups include a daytime test of every zone.

Leaks, Bills and City Rebates
The City provides water and sewer service, and its Water and Sewer Services page posts a form for asking the City to look at a leak on your account, alongside billing contacts. When a bill spikes, we look for the leak in the irrigation first, because a cracked lateral or a valve that won’t close can run unseen for weeks.
Through its Water Conservation Rebate Program, the City funds rebates for lawn removal, irrigation retrofits, rain barrels and smart controllers. Under the Cash for Grass terms, a City pre-conversion visit has to happen while the grass is still in place, replacement watering has to be automatic low-volume drip with a pressure regulator, filter and low-flow emitters, the converted area gets a mulch layer of two to three inches, and the planting has to reach at least half coverage at maturity. The Irrigation Retrofit terms support moving overhead spray to drip and manual valves to automatic ones, and the Smart Irrigation Controller terms cover weather-adjusting controllers from the approved list. Each program requires City approval before work starts, has limited funding, and sets its own amounts and conditions on the form, so read those first; we can lay out a plan that fits them.
Trenches and the Storm Drain
The City’s Stormwater Management page requires projects creating or replacing over 2,500 square feet of hard, impervious surface to include stormwater controls, with a condensed manual for single-family homes. A sprinkler retrofit rarely comes near that, but dirt still washes downhill, so excavated soil sits on plastic sheeting or inside planting areas, trenches get closed up by day’s end when possible, and sweep the street before leaving.
We Work Inside the Property Line
According to the Engineering Division, any work in the City right-of-way needs an encroachment permit. Parkway planting strips, curb-side meter boxes and lines under the sidewalk are not part of our work. Lines running near a neighbor are set from surveyed corners, not from wherever the fence was built.
Call 811 and Check the License
The CSLB notification center page says anyone who excavates has to contact the regional center first so utility owners can mark their lines. A sprinkler trench is only inches deep, yet it can cross an entire lot, so every job starts with an 811 ticket and hand digging near the marks. You can verify any contractor’s license, including ours, through CSLB’s consumer pages.

Our Irrigation Process
- Test what’s there. Each station gets turned on while we note leaks, overspray and brown spots, and locate the controller and main shut-off.
- Check the City side. Whether a City permit is already involved, whether new planting tops the 500 square foot line, which of the three plant options suits the yard, and whether to file for a rebate before removing anything.
- Design the zones. Hydrozones, valve groups, heads and emitters, pipe routes and controller placement, matched to the gallons per minute and pressure measured at the tap.
- Build and flush. Trench, lay pipe, set valves, filters and regulators, and flush each line before emitters and nozzles go on.
- Program and hand off. Schedules kept out of the 10-to-4 window, a zone-by-zone walk with you, and the schedule left inside the controller door.
Morro Bay Contacts
- Public Works (conservation programs and rebate applications): 955 Shasta Avenue, 805-772-6261.
- Encroachment permits: 805-772-6285.
- Utility Billing (billing and leak questions): 805-772-6222.
- City Hall: 595 Harbor Street, 805-772-6200.
- Before any digging: call 811.
License: CSLB #986950, classifications B and C-27; everything we install sits inside the owner’s lot. The summary above draws on City of Morro Bay documents, the State Water Board, DWR and the Contractors State License Board, all read on October 30, 2026. Use it as a homeowner primer only. It is neither legal nor engineering advice, nor something the City has signed off on. Water stages and codes shift, and City staff have the final say for each parcel; if their direction conflicts with a posted document, we follow it and request it by email.
More Guides for Morro Bay Homeowners
Related pages for the same part of the coast:
- Landscaping in Morro Bay
- Morro Bay drainage
- Morro Bay retaining walls
- Morro Bay concrete work
- Cayucos landscaping
- Irrigation in Pismo Beach
- Irrigation in Nipomo
- Irrigation in Grover Beach
- Rebates for taking out a lawn
- Irrigation, start to finish
Every town we work in is listed on our service area page.
Comparing towns? Our watering rules by town in SLO County page lays out every local water supplier’s current hours, days and rain rules side by side.
Frequently Asked Questions
Is a City permit required to replace sprinklers in Morro Bay?
For a simple head-and-valve replacement in an established yard, normally no; the landscape chapter targets new development and new or redone landscapes with over 500 square feet of fresh irrigated area. Ask the City first when the job is a big makeover.
What are the watering hours in Morro Bay right now?
The City lists Morro Bay in its Moderately Restricted condition, so outdoor watering is off from 10 in the morning through 4 in the afternoon. Excessive gutter runoff is prohibited, and driveways and patios may not be hosed down. Tighter stages would limit watering to set days by address.
Are lawns still allowed in Morro Bay?
They are. Where the landscape chapter applies, grass is limited to one fourth of the planted area, cannot go on slopes over 25 percent, and stays out of strips narrower than 10 feet. Lawns you already have can remain.
Does my irrigation line need a backflow device?
A system tied to drinking water needs protection against backflow, and the right assembly depends on the hazard under the State’s cross-connection rules. We confirm the requirement with the City before building a tie-in and install it on the private side where it can be tested.
Does Morro Bay offer rebates for irrigation upgrades?
It does. The City funds rebates for converting lawn, retrofitting spray to drip, rain barrels and weather-based controllers. Each needs City approval and a site visit before work starts, and the amounts and terms are on each program’s form.
Planning New Irrigation in Morro Bay?
Send pictures of your planting areas and the timer by text or email. A no-cost visit follows: we turn on each station, look up which City requirements touch the property, then email you a written proposal.
Call 805-712-4440 Discuss Your Project
Paso Robles Landscaping · 1345 Riverside Ave, Paso Robles · Licensed contractor, CSLB #986950 · Serving all of San Luis Obispo County